Substations DB 6 kV (20 sections) (based on ABB equipment) Supply, Assembling and Setting. Substation DB 04 Supply, Assembling and Setting Podolsky Cement OJSC 2010
Technological Pipelines Heating System Equipment Supply and Setting Podolsky Cement OJSC 2008
External Lighting for Clinker Rolling Mill #1 Electric Filter Cement Ltd 2006
High-Voltage Power Supply System Equipment Supply, Assembling, Commissioning Podolsky Cement OJSC 2008
Control and Measuring Devices Equipment Supply and Setting Podolsky Cement OJSC 2008
Substations 6/0,4 kV Equipment Supply, Assembling, Commissioning Podolsky Cement OJSC 2008
- Equipment Supply, Assembling, Commissioning for Power Supply and Lighting Systems, Low-Voltage Devices Production (Building Sections №№1,2,3) Podolsky Cement OJSC 2008
Mill #3 Technological Line Power Cable System 6 кВ, 0,4 кВ Designing Ivano-Frankovskcement PJSC 0
Distributing Board MDB Projecting and Production Volyn-Cement PJSC 2008
Mill #6 Complex Projecting, Supply and Assembling Cement Ltd 2006
Workshop Substation for Grinding Section (based on Siemens equipment) Cement Ltd 2006
Substation 35/ 6/0,4 kV (based on Shneider equipment) Production Knauf Gips Donbass Ltd 2005
Substations +АВ и + АЕ Setting, Testing and Measuring Knauf Gips Donbass Ltd 2007
Проект, изготовление, поставка, монтаж и наладка распредустройства MDB Volyn-Cement PJSC 2008
Поставка, монтаж, наладка 4х подстанций РУ 6 КВ (36 ячеек), производства компании АВВ и 4х подстанций РУ 6 КВ Podolsky Cement OJSC 2010
Проектирование системы внутреннего электроосвещения вновь строящихся объектов при переводе вращающихся печей №№ 2-7 на угольное топливо и наружного освещения территории Volyn-Cement PJSC 2010
Проектирование системы внутреннего электроосвещения вновь стрроящихся объектов при переводе вращающихся печей №№ 1, 2 на угольное топливо и наружного освещения прилегающей территории, автодорог Yugcement PJSC 2010
Measuring and Testing Knauf Gips Donbass Ltd 0
Проектирование автоматического ввода резерва в РУ 35 кВ "Подстанции +АА" Knauf Gips Donbass Ltd 2011
Выполнение приемо-сдаточных испытаний электрооборудования подстанции "22д" Podolsky Cement OJSC 2011
Модернизация трансформаторной подстанции 6/0,4 кВ "+AD" Кальцинирования. Knauf Gips Donbass Ltd 2011
Internal Lighting Projecting (Mills №№ 1, 2 Coal Fuel Transfer). Territory and Roads External Lighting Projecting Yugcement PJSC 2010
Internal Lighting Projecting (Mills №№ 2-7 Coal Fuel Transfer). External Lighting Projecting Volyn-Cement PJSC 2010
solution enterprise year
The Automatic Control System for FATA Coloring Afterburner Heat-Gene Module PJSC 2002
Clinker Production Technological Lines Cement Ltd 2003
Clinker Production Technological Lines Ivano-Frankovskcement PJSC 2001
Clinker Production Technological Lines Yugcement PJSC 2005
Closed Loop Cement Grinding Automation System Ivano-Frankovskcement PJSC 2002
Closed Loop Cement Grinding Automation System Cement Ltd 2002
Closed Loop Cement Grinding Automation System Yugcement PJSC 2006
Clinker Production Conversion from Gas to Pulverized Coal (Furnaces №№1, 2, 3) Ivano-Frankovskcement PJSC 2002
Cement Silos Automation Yugcement PJSC 2006
Asbestosfree Roofing Slate Line Automation Ivano-Frankovskcement PJSC 2003
Ruberoid Production Line Automatic Control System Slavuta Ruberoid Plant OJSC 2003
Bitumen Blend Production Unit Automation Slavuta Ruberoid Plant OJSC 2005
Automatic Control System for Clinker Reception to Storehouse and Supply to Cement Mill Ivano-Frankovskcement PJSC 2008
Automatic Control System for Dry Cement Production (Furnace №3). Gas burner control cabinet modernization Ivano-Frankovskcement PJSC 2008
Cement Grinding Line Automation (Mill 6) Cement Ltd 2008
Cement Packing Line Automation Eurocement Ukraine PJSC 2009
Automatic Control System for Furnaces and Packing Junction Volyn-Cement PJSC 2010
Automatic Control System for Furnaces №№1,2 Operation on Gas and Coal. Mill 6 Transformer Safety Setting and Visualization. Cement Ltd 2010
solution enterprise year
Монтаж системы электроосвещения печи №3 и галереи подачи клинкера Ivano-Frankovskcement PJSC 2008
Монтаж силовых кабельных сетей 0,4 кВ между подстанциями ТП-21, ТП-22, ТП-23, ТП-24, РП-0,4 и щитами силового управления Ivano-Frankovskcement PJSC 2008
Монтаж силовой кабельной сети 6 кВ между подстанциями 110/6 кВ, 6/0,4 кВ и механизмом дымососа Ivano-Frankovskcement PJSC 2008
Проектирование и монтаж системы электроосвещения вагонопогрузки нового упаковочного отделения Volyn-Cement PJSC 2009
Монтаж электромеханической части в Зонах 1,2, 3 при переводе производства цемента на сухой способ Podolsky Cement OJSC 2009
Электромеханические работы по прокладке кабеля 6 кВ Podolsky Cement OJSC 2010
solution enterprise year
Сервсиное обслуживание линий упаковки цемента №№1,2 Volyn-Cement PJSC 2011