Partners

We accept the challenge of modern automation and release innovative projects!

Machine Building

solution enterprise year
Distributing Boards 6kV (28 sections) and 04 Substations Projecting, Supply, Assembling and Setting Novokramatorsk Machine Building Plant PJSC 2010
Substations DB 6 kV (20 sections) Supply and Setting Krimtrolleybus CSPE 2010
solution enterprise year
Проектирование и изготовление электрооборудования, разработка программного обеспечения для шлифовальных станков ХШ1-138Ф2 и ХШ1-140Ф2 Kharkov Machine Building Plant (Kharverst) OJSC 0
Модернизация фрезерных станков SKODA 1, 2, 3 Turboatom OJSC 0
Модернизация фрезерного станка INNSE Turboatom OJSC 0
Модернизация токарного станка MDW-30 Sumi SPA n.a. Frunze PJSC 0
Модернизация горизонтального фрезерно-росточного станка FA-CRS Sumi SPA n.a. Frunze PJSC 0
Проектирование и изготовление электрооборудования, программного обеспечения для приводов SIMOREG, изготовление панелей, шефмонтаж, шефналадка при пуске в эксплуатацию карусельного станка «1563» Turboatom OJSC 0
Проектирование программного обеспечения для комплектной системы управления станком «SKODA SIU-400», изготовление принципиальных и монтажных схем, наладка на стендах цифро-аналоговой системы управления, поставка, шефмонтаж, пробный пуск и функциональный ко Turboatom OJSC 0
Разработка КД, изготовление и поставка шкафов управления для станка модели 3415КН7В-CNC 0
Разработка КД, изготовление и поставка шкафов управления для станка модели 3413М-CNC 0
Разработка КД, изготовление и поставка шкафов управления для станка модели ХШ5-30ВФ3ЗРМ 0

Construction Materials

solution enterprise year
Substations DB 6 kV (20 sections) (based on ABB equipment) Supply, Assembling and Setting. Substation DB 04 Supply, Assembling and Setting Podolsky Cement OJSC 2010
Technological Pipelines Heating System Equipment Supply and Setting Podolsky Cement OJSC 2008
External Lighting for Clinker Rolling Mill #1 Electric Filter Cement Ltd 2006
High-Voltage Power Supply System Equipment Supply, Assembling, Commissioning Podolsky Cement OJSC 2008
Control and Measuring Devices Equipment Supply and Setting Podolsky Cement OJSC 2008
Substations 6/0,4 kV Equipment Supply, Assembling, Commissioning Podolsky Cement OJSC 2008
- Equipment Supply, Assembling, Commissioning for Power Supply and Lighting Systems, Low-Voltage Devices Production (Building Sections №№1,2,3) Podolsky Cement OJSC 2008
Mill #3 Technological Line Power Cable System 6 кВ, 0,4 кВ Designing Ivano-Frankovskcement PJSC 0
Distributing Board MDB Projecting and Production Volyn-Cement PJSC 2008
Mill #6 Complex Projecting, Supply and Assembling Cement Ltd 2006
Workshop Substation for Grinding Section (based on Siemens equipment) Cement Ltd 2006
Substation 35/ 6/0,4 kV (based on Shneider equipment) Production Knauf Gips Donbass Ltd 2005
Substations +АВ и + АЕ Setting, Testing and Measuring Knauf Gips Donbass Ltd 2007
Проект, изготовление, поставка, монтаж и наладка распредустройства MDB Volyn-Cement PJSC 2008
Поставка, монтаж, наладка 4х подстанций РУ 6 КВ (36 ячеек), производства компании АВВ и 4х подстанций РУ 6 КВ Podolsky Cement OJSC 2010
Проектирование системы внутреннего электроосвещения вновь строящихся объектов при переводе вращающихся печей №№ 2-7 на угольное топливо и наружного освещения территории Volyn-Cement PJSC 2010
Проектирование системы внутреннего электроосвещения вновь стрроящихся объектов при переводе вращающихся печей №№ 1, 2 на угольное топливо и наружного освещения прилегающей территории, автодорог Yugcement PJSC 2010
Measuring and Testing Knauf Gips Donbass Ltd 0
Проектирование автоматического ввода резерва в РУ 35 кВ "Подстанции +АА" Knauf Gips Donbass Ltd 2011
Выполнение приемо-сдаточных испытаний электрооборудования подстанции "22д" Podolsky Cement OJSC 2011
Модернизация трансформаторной подстанции 6/0,4 кВ "+AD" Кальцинирования. Knauf Gips Donbass Ltd 2011
Internal Lighting Projecting (Mills №№ 1, 2 Coal Fuel Transfer). Territory and Roads External Lighting Projecting Yugcement PJSC 2010
Internal Lighting Projecting (Mills №№ 2-7 Coal Fuel Transfer). External Lighting Projecting Volyn-Cement PJSC 2010
solution enterprise year
The Automatic Control System for FATA Coloring Afterburner Heat-Gene Module PJSC 2002
Clinker Production Technological Lines Cement Ltd 2003
Clinker Production Technological Lines Ivano-Frankovskcement PJSC 2001
Clinker Production Technological Lines Yugcement PJSC 2005
Closed Loop Cement Grinding Automation System Ivano-Frankovskcement PJSC 2002
Closed Loop Cement Grinding Automation System Cement Ltd 2002
Closed Loop Cement Grinding Automation System Yugcement PJSC 2006
Clinker Production Conversion from Gas to Pulverized Coal (Furnaces №№1, 2, 3) Ivano-Frankovskcement PJSC 2002
Cement Silos Automation Yugcement PJSC 2006
Asbestosfree Roofing Slate Line Automation Ivano-Frankovskcement PJSC 2003
Ruberoid Production Line Automatic Control System Slavuta Ruberoid Plant OJSC 2003
Bitumen Blend Production Unit Automation Slavuta Ruberoid Plant OJSC 2005
Automatic Control System for Clinker Reception to Storehouse and Supply to Cement Mill Ivano-Frankovskcement PJSC 2008
Automatic Control System for Dry Cement Production (Furnace №3). Gas burner control cabinet modernization Ivano-Frankovskcement PJSC 2008
Cement Grinding Line Automation (Mill 6) Cement Ltd 2008
Cement Packing Line Automation Eurocement Ukraine PJSC 2009
Automatic Control System for Furnaces and Packing Junction Volyn-Cement PJSC 2010
Automatic Control System for Furnaces №№1,2 Operation on Gas and Coal. Mill 6 Transformer Safety Setting and Visualization. Cement Ltd 2010
solution enterprise year
Монтаж системы электроосвещения печи №3 и галереи подачи клинкера Ivano-Frankovskcement PJSC 2008
Монтаж силовых кабельных сетей 0,4 кВ между подстанциями ТП-21, ТП-22, ТП-23, ТП-24, РП-0,4 и щитами силового управления Ivano-Frankovskcement PJSC 2008
Монтаж силовой кабельной сети 6 кВ между подстанциями 110/6 кВ, 6/0,4 кВ и механизмом дымососа Ivano-Frankovskcement PJSC 2008
Проектирование и монтаж системы электроосвещения вагонопогрузки нового упаковочного отделения Volyn-Cement PJSC 2009
Монтаж электромеханической части в Зонах 1,2, 3 при переводе производства цемента на сухой способ Podolsky Cement OJSC 2009
Электромеханические работы по прокладке кабеля 6 кВ Podolsky Cement OJSC 2010
solution enterprise year
Сервсиное обслуживание линий упаковки цемента №№1,2 Volyn-Cement PJSC 2011

Metallurgy

solution enterprise year
Automatic Control System for Speed Modes and Intercellular Pull MittalSteel Temirtau JSC 1999
Blanks Warming Automatic Control System for Circle Furnace Interpipe Niko Tube Ltd 2004
Electric Drives and Automatic Control System for Continuously Etching Units №№1,2 MittalSteel Temirtau JSC 1998
Automatic Control System for Bars Warming in Soaker MittalSteel Temirtau JSC 2000
Flat Bar Laminar Cooling System MittalSteel Temirtau JSC 2001
Electric Drives and Automatic Control System for Transversal Crosscut Unit MittalSteel Temirtau JSC 2003
Numerical Control and Position Indication System for Finishing Group Mechanisms MittalSteel Temirtau JSC 2004
Automatic Control System for Mill Tail MittalSteel Temirtau JSC 2004
Automatic Control System for Blast Furnace 4 Electric Drives MittalSteel Temirtau JSC 2005
Adjoining Rollers and Manipulator Lines Automation System, Mill 2000 Novolipecky Metallurgic Plant OJSC 2001
Coil Winders Principal Electric Drives Automation System, Mill 2000GP Kamensk-Uralsky Metallurgic Plant OJSC 2002
Projecting and Implementation of the Charge Loading and Delivery System, Blast Furnaces №№ 2, 3, 4, 5 Mariupol Metallurgic Plant n.a. Ilyich PJSC 2002
Gas Combustion Regulation System Projecting (Blast Furnaces №№ 2, 5 Air Heater) Mariupol Metallurgic Plant n.a. Ilyich PJSC 2008
Automatic Control System for АТОN-2500 Air Heater in Two-Section Blast Furnace Norilsky Nickel OJSC 2003
Projecting of Electric Drives and Automatic Control System for Sheet-straightener Mill 5000 Alchevsk Metallurgic Plant PJSC 2009
Automatic Control System for Tubes Tempering and Arbors Warming in the Section Furnace Interpipe Niko Tube Ltd 2004
Automatic System for Adjusting Rollers Contreras and Electric Drives of the Sheet-straightener Severstal OJSC 2003
Projecting of Electric Drives and Automatic Control System for Sheet-straightener Mill 5000, 2500 Severstal OJSC 2002
Projecting of Electric Drives and Automatic Control System for Sheet-straightener Mill 5000, 2500 Alchevsk Metallurgic Plant PJSC 2006
Low-voltage Complex Unit Supply for Coke-oven Battery ArcelorMittal Krivy Rih PJSC 2006
Project for Electric Drives and Power Equipment Automatic Control System (Blast Furnace №8) ArcelorMittal Krivy Rih PJSC 2007
Charge Loading and Delivery Automatic Control System for Blast Furnace №4 Mariupol Metallurgic Plant n.a. Ilyich PJSC 2007
Blast furnace №8 Aspiration. Low-voltage Units production ArcelorMittal Krivy Rih PJSC 2008
АСУ ТП и САУ электропривода доменной печи № 8 ArcelorMittal Krivy Rih PJSC 2008
Projecting of Electric Drives and Automatic Control System for Sheet-straightener Mill 5000 Alchevsk Metallurgic Plant PJSC 2009
Sheet-straightener №№1, 2 Automation and Transversal Crosscut Unit Projecting Magnitogorsk Metallurgic Plant OJSC 2008
Transport Line MNLZ №6 KKC Control System Magnitogorsk Metallurgic Plant OJSC 2008
Canting Mechanism Automatic Control System Projecting, Programming and Supply Metchel-Koks Ltd 2010
Wire mill 250 Makeevka Metallurgic Plant OJSC 1994
Реконструкции конвертера №1 ArcelorMittal Krivy Rih PJSC 2011
Ситема автоматизации приводов вентиляторов газовых горелок воздухонагревателей 1,2,3,4 ДП №1. Проект, поставка, монтаж, пусконаладка Mariupol Metallurgic Plant n.a. Ilyich PJSC 2010
Проектирование, разработка программного обеспечения, поставка системы управления коксовых машин – машины двересъемной, коксовыталкивателя Magnitogorsk Metallurgic Plant OJSC 2011
Проектирование, разработка программного обеспечения, поставка системы управления коксовых машин – машины углезагрузочной, машины двересъемной, коксовыталкивателя Metchel-Koks Ltd 2011
Проектирование, разработка программного обеспечения, поставка системы управления коксовых машин – машины углезагрузочной, машины двересъемной, коксовыталкивателя Yasynovka Metallurgic Plant PJSC 2011
Проектирование, разработка программного обеспечения, поставка системы управления коксопробного барабана, шеф - монтажные и пусконаладочные работы Novolipecky Metallurgic Plant OJSC 2011
Проектирование, разработка программного обеспечения, поставка системы управления коксовых машин – машины углезагрузочной, машины двересъемной, коксовыталкивателя Chelyabinsk Metallurgic Plant OJSC 2011
Проектирование, разработка программного обеспечения, поставка системы управления электровозом ЭКУ-2М Yasynovka Metallurgic Plant PJSC 2011
Проектирование, разработка программного обеспечения и поставка системы управления двух электровозов ЭКУ-1М, шеф - монтажные и пусконаладочные работы. Chelyabinsk Metallurgic Plant OJSC 2011
solution enterprise year
Power Supply and Lighting System for Blast Furnace #4 MittalSteel Temirtau JSC 2005
Substations DB 6 kV (18 sections) Supply, Assembling and Setting. Substation DB 04 Supply, Assembling and Setting ArcelorMittal Krivy Rih PJSC 2010
solution enterprise year
Сервисное обслуживание системы автоматизации коксовых машин батареи №4 Yasynovka Metallurgic Plant PJSC 2011

Oil and Gas

solution enterprise year
Разработка проектно-конструкторской документации, АСУ ТП, изготовление и поставка оборудования и программного обеспечения, монтаж, пуско-наладочные работы и ввод в эксплуатацию АСУ ТП склада хранения зжиженных углеводородов Poltava Gas and Oil Company CE 2011

Pharmacy

solution enterprise year
Automated Control System Modernization for Pharmaceutical Water Preparation Zdorovye Pharmaceutical Company Ltd 2009
RW-500 Automated Control System Modernization Zdorovye Pharmaceutical Company Ltd 2009
Automated Control System Modernization for: Tube Machine, Tube Packing, Ointment Final Box Packing, Cupping-Glass Final Box Packing, Label Machine, Cupping-Glass Packing, Nitric Machine, Homogenizer. Zdorovye Pharmaceutical Company Ltd 2010
Модернизация АСУ установки Гомогенизатор Zdorovye Pharmaceutical Company Ltd 2010
Automated Control System Modernization for Intravenous Water Preparation Zdorovye Narodu Pharmaceutical Company Ltd 2010
Разработка программного обеспчения АСУ стерелизатора Zdorovye Pharmaceutical Company Ltd 2011
Разработка программного обеспечения АСУ дистиллятора Zdorovye Pharmaceutical Company Ltd 2011

Woodworks

solution enterprise year
Поставка, монтаж, наладка, коррекция ПО датчика наличия кромки полосы кромко-держателя бобинно-резательной машины, обучение персонала Rogan Cardboard Factory PJSC 2011
solution enterprise year
Distributing Power Boards 380/220В Production and Supply Krono Invest Ltd 2008

Community Facilities

solution enterprise year
Relay Protection Microprocessor Complexes for 3 Substations Donetsk International Airport ME 2010
Substations DB 6 kV (20 sections) Supply and Setting Krimtrolleybus CSPE 2011
Модернизация РУ-6 кВ. Проект, монтаж, наладка шести ячеек КРУ типа ВМ-1 Kharkovoblenergo JSC 2011

Food industry

solution enterprise year
Substations 6/0,4 Production Philip Morris Ukraine PJSC 2010
Substations 6/0,4 kV Developing and Supply (equipment by Shneider) Zaporozhye Oil Plant 2003
Power Supply and Lighting Reconstruction Philip Morris Ukraine PJSC 1999
Measuring and Testing Philip Morris Ukraine PJSC 0
solution enterprise year
Разработка, изготовление и поставка весового контроллера. Монтаж, Подключение весового контроллера к существующей АСУ элеватора. Ввод в эксплуатацию Slavuta Malt Plant PJSC 2011
Модернизация АСУ микросолодовни Malteurope Ukraine Ltd 2011
Beer Bottling Section Automation Rogan Brewery OJSC 2001
Автоматизация системы управления пастеризацией пива Rogan Brewery OJSC 2002
Beer Fermentation Automated Control System. Beer Storage Thermal Mode Poltavpivo Company PJSC 2003
Automated Control System for 4 Heat Generators ATON-2500 Malteurope Ukraine Ltd 2003
Автоматизация системы управления ворошителей ящиков соложения Eastern-Ukrainian Company Malteurop Ltd 2004
Автоматизация системы управления ворошителей ящиков соложения Malteurope Ukraine Ltd 2004
Wetting, Green Sprouting and Drying Automated Control System Eastern-Ukrainian Company Malteurop Ltd 2004
Wetting, Green Sprouting and Drying Automated Control System Malteurope Ukraine Ltd 2004
Malt Undermining Automated Control System, Barley Green Sprouting Automation Control System Slavuta Malt Plant PJSC 2007
Seed Production Automated Control System Dmitrovka Grain Plant PJSC 2008
Автоматизация системы управления электрической части КИП и А электрофильтра ЭГУ1-15/400-7,5-6/640-2 Agroproinvest 08 Ltd 2010

Элакс © 2017